Project tools

Sync your content calendar to Asana

Mirror each calendar post as an Asana task that moves through Planned, Drafting, Review and Published.

OAuth (Asana)

What it does

Connect Asana and every post on your saved content calendar appears as a task in the project you pick. As a post moves through drafting, review, approval and publishing, its task moves between sections.

Wavefront stays the source of truth: a post's task changes within seconds of a status change, and a published post completes its task.

Before you start

  • Owner role in the Wavefront workspace
  • An Asana project

How to connect Asana

  1. In Wavefront, open Settings → Integrations and choose Connect Asana under Project tools.
  2. Approve access in Asana.
  3. Pick the project the tasks go to.
  4. Choose Sync now, or let it sync on its own.

What it covers

  • One task per calendar post, with the title and calendar date as the due date
  • Notes with the format, strategy, keyword, pillar, angle and a link to the post
  • Sections for Planned, Drafting, Ready for review, Approved and Published
  • Tags for the format and the strategy
  • A post removed from the calendar completes its task

Good to know

  • One-way: moving a due date in Asana doesn't move the post, and edits to synced fields are overwritten.
  • Assignees, comments, subtasks and custom fields you add in Asana are left alone.
  • Only the owner who connected Asana can pick the project.

Publish your next post with your team's sign-off

Start a 7-day trial with 300 credits and every feature. No card needed. Then $99 a month.