What it does
Connect Trello and every post on your saved content calendar appears as a card on the board you pick. As a post moves through drafting, review, approval and publishing, its card moves between lists.
Wavefront stays the source of truth, and a published post marks its card's due date complete.
Before you start
- Owner role in the Wavefront workspace
- A Trello board
How to connect Trello
- In Wavefront, open Settings → Integrations and choose Connect Trello under Project tools.
- Allow Wavefront to read and write your boards on Trello's page.
- Pick the board the cards go to.
- Choose Sync now, or let it sync on its own.
What it covers
- One card per calendar post, with the title and calendar date as the due date
- A description with the format, strategy, keyword, pillar, angle and a link to the post
- Lists for Planned, Drafting, Ready for review, Approved and Published
- Labels for the format and the strategy
- A post removed from the calendar archives its card
Good to know
- One-way: moving a due date in Trello doesn't move the post, and edits to synced fields are overwritten.
- Other card fields you add in Trello are left alone.
- Only the owner who connected Trello can pick the board.